St Mary’s Calne
Set within the heart of the school campus, this project required the construction of a specialist sixth form boarding house in conjunction with a Master Plan for the school, also developed by NVB.
The 3 storey building houses 44 study bedrooms with en-suites. Each level of the building is provided with a kitchen and social space for student use. A large dining and social area is located at ground floor level. A 3 storey housemistress house and 3 tutor flats are included in the scheme and are located to ensure easy access for supervision at all levels.